PRODUCT DESCRIPTION

High temperature resistant, stitched, Rabitz wire coated heat and fire insulation mattress.

APPLICATION AREAS

It is used for heat and fire insulation in big diameter pipes, industrial plants and process equipment.

APPLICATION PRINCIPLES

Terrawool Stone Wool Industrial Blankets provide heat and fire insulation in places with high fire resistance. It is wounded on large diameter pipes and the joints are passed through the Rabitz wire of the galvanized wires and sewn.  On large surfaces, it is applied in the form of insertion lathes. Sheet metal is coated for the protection.

Technical Table

All our products are adaptable and can be customised on request in density, thickness, size and coating with a minimum order.
 

Density

Thickness

Size
(mm x mm)

Roll (adet)

m²/Roll

80

50

1200 x 5000

1

6.00

1.000

1.700

80

60

1200 x 5000

1

6.00

833

1.416

80

80

1200 x 3000

1

3.60

625

1.625

80

100

1200 x 3000

1

3.60

500

1.176

90

50

1200 x 5000

1

6.00

1.000

1.700

90

60

1200 x 5000

1

6.00

833

1.416

90

80

1200 x 3000

1

3.60

625

1.625

90

100

1200 x 3000

1

3.60

500

1.176

100

40

1200 x 8000

1

9.60

1.250

2.125

100

50

1200 x 5000

1

6.00

1.000

1.700

100

60

1200 x 5000

1

6.00

833

1.416

100

80

1200 x 3000

1

3.60

625

1.625

100

100

1200 x 3000

1

3.60

500

1.176

125

50

1200 x 3000

1

3.60

1.000

1.700

125

60

1200 x 3000

1

3.60

833

1.416

125

80

1200 x 3000

1

3.60

625

1.625

125

100

1200 x 3000

1

3.60

500

1.176


Download certification

Reminders on Loading, Unloading, Transport and Storage:
 
• It should be done in closed areas in rainy weather.
• Stretch the canvas even when hey are shipped for short distances
• It should be stored in the package and the damaged package should not be used.
• Packages should not be stacked on top of each other
• The products are not be stepped on or used as a step.
• Before pulling with rope, hard cardboard with dimensions of 50x20 cm size should be placed under the rope.
• Storage area should be closed to prevent leakage during rain, flooding etc.
• The storage floor must be flat and non-slippery
• Loading and unloading should be done with the roof crane.
• Plates should be carefully transported to the application area by two persons.
• Before pulling the rope, 50x20 cm hard cardboard should be placed under the rope.
• The storage floor must be flat and non-slippery